After-Sales Service Provided | Engineers Available To Service Machinery Overseas | Name | Glazed Tile Making Machine |
Condition | As Customer Require | Weight | 5.4T |
Certification | CE/ISO9001 | Color | Client’s Request |
High Light | Cold roll forming machine, double deck roll forming machine |
Galvanized Metal Roofing And Wall Double Layer Roll Forming Machine
BOTOU SHITONG COLD ROLL FORMING MACHINERY MANUFACTURING CO.,LTD. was established in 2001.Our company is a comprehensive enterprise intergrating production,sales and service.We are mainly devoted to the development and manufacturing of metal plate cold bending roll forming equipment.
Technical Parameters
Raw Material | |
Material Spec | Colored steel sheet, galvanized steel sheet, aluminum sheet |
Thickness of Coil Sheet | 0.2-0.8 mm |
Material Expand Width | 1250mm |
Machine Details | |
Roller Material | High grade NO. 45 forged steel with 0.05mm hard chrome plating |
Shaft Material | High grade NO. 45 carbon wrought steel |
Cutting Blade | Cr12 mould steel with quenched treatment |
Diameter of Shaft | 70mm |
Main Frame | 350 H steel |
Forming Steps | Up layer:11 rows; Down layer:13rows |
Productivity | 20-25m/min |
Hydraulic Station Power | 5.5 KW |
Hydraulic Pressure | 10-12MPa |
Controlling System | Famous PLC computer control |
Material of Cutting Table | Cr 12 mould steel with quenched treatment |
Appearance Size | 6700mm*1500mm*1510mm |
Hydraulic Oil | 40# hydraulic oil |
Electric Tension | 380V 50 Hz 3 Phase or as your requirements |
Device Configuration
Manual Decoiler | 1 set |
Guiding Device | 1 set |
Main Roll Forming Machine | 1 set |
Hydraulic Cutting Device | 1 set |
PLC Electric Control System | 1 set |
Hydraulic Driving System | 1 set |
Special Tools And Parts | 1 set |
30% as deposit ,balance payment after inspection while before delivery.
Production Period
30 days after the 30% deposit.
Packing Method
Nude packing in the 40 feet container ,fixed well with oil rope, control cabinet and all the accessories with waterproof.
After-Sell Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation
If installation is needed, the seller will dispatch a technician to the buyer’s factory abroad to assist regulating the machine with charge free. The buyer should assist the seller to get the Chinese technician’s visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Position the machine in the buyer’s factory.
Prepare necessary electric wiring.
Prepare material of trial running.
Provide labors for assistance and installation during installation.
Packaging
Important Components Wiped Anti Rust Oil, Rollers and Shafters covered by foam film, Hydraulic station, PLC control Box, Spare parts and some small partsPacked in plywood box. All Components Fixed by steel wire with Container.
Payment Terms
30%T/T after signed the contract,balanced before delivery
Warranty
(1) One year, and we will provide the technical support for the whole life.
(2) Training: The buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary.
(3) Need one technicians
(4) Training time: One week (contains the time of installation and adjustment)
Machine Pictures
FAQ
1. Q: What details of the machine you should get from me.
A: I will confirm all details with you, such as the voltage in your city.
2. Q: I am new in this field. How could i understand the machine very well.
A: Why not contact me. I promise you that you will be professional after you get from me. It is true thing.
3. Q: I receive a lot of quotations, they are big range, How could i choose?
A: I have many easy ways to solve it. Fox example, I can teach you how to find the Traders out. Just contact me. It is free for contacting with me.
4. Q: Can you give me one suggestion for ordering the machine.
A: No problem. Do not trust your eyes when you see beautiful pictures of machines or factories. More when you contact.
5. Q: I have not whatsapp and skype, how could I contact with you.
A: Send me one inquiry in the end of this page. Leave your contact information for me. I will contact you. It is free.
6. Q: What do you think what is the most important for roll forming machine.
A: Drawing ! Drawing ! Drawing !