After-Sales Service Provided | Video Technical Support | Voltage | 380V 50HZ 3phase |
Name | Sheet Metal Roll Forming Machines | Step | 13 |
Roller Material | High Grade NO. 45 Forged Steel With 0.05mm Hard Chrome Plating | Shaft Material | High Grade NO. 45 Carbon Wrought Steel |
High Light | Metal roof roll forming machine, metal roofing sheet making machine |
Aluminum Sheet Profile Production Making Sheet Metal Roll Forming Machiner Line Price
BOTOU SHITONG COLD ROLL FORMING MACHINERY MANUFACTURING CO.,LTD. is a professional manufacturer and exporter which has its own factory and also cooperate with several production factories and associated nterprises, concerning with the design, development and production of cold roll forming machines,material of building.
It is located in northwest of CangZhou, as a long history of cold roll forming machine production base. All products comply with international quality standards and are greatly appreciated in variety of different markets throughout the world, such as Asia, Africa, Europe,South America, and Australia and so on.
Sturcture and reasonable design.
Technical Parameters
Configurations | Manual decoiler, main machine of roll forming, cutting device, output table, electric motor, PLC control system | ||||
Material | Processing material | Colored Steel plate, Galvanized Board, Aluminum Plate | |||
Thickness | 0.3mm-0.8mm | ||||
Efficienty width | 750mm | ||||
Coil width | 1000mm | ||||
Manual Decoiler | The maximum load capacity:5 ton | Expand by band | |||
The coil inside diameter:450-550mm | |||||
Suitable Coil width:1250mm | |||||
Main Forming Machine | Forming steps | 13steps | |||
Shaft diameter | 70 mm | ||||
Thick of arch frame | 16mm | ||||
Frame body | High strength steel pipe weld with color steel sheet cover | ||||
Roller material | 45# steel | ||||
Shaft material | 45# steel | ||||
Cutter material | Cr12 mold steel with quenched treatment | ||||
Transmission | By 1” chain | ||||
Work speed | 20-25m/min | ||||
Hydraulic System | Automatic hydraulic cutting after forming, without wasting. | ||||
Control Device | PLC control; touch screen; Program language: English/Chinese(or as required) | ||||
Operating Mode | Button+touch screen | ||||
Total power | 4 kw | ||||
Main body color | Blue and orange(or as required) | ||||
Voltage | 380v/50hz/3ph(or as required) |
Machine Pictures
A. If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also trainyour workers/technician face to face.
B. Without visiting, we will send you user manual and video to teach you to install and operate.
C. If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.
After Service
A. One year guarantee for whole machine.
B. 24 hours technical support by email or phone call.
C. If there is any problem found of the machine, we will repair it for free in one year.
Package And Warranty
1. Nude,with waterproof cloth and stow-wood.Imported computer control system packed with waterproof cloth and card board.
2. This producing line is maintained free of charge for 18 months.When the machine is used in China,we will install and debug the machine for free;if it is used at abroad,we will send the professional technician to debug.Buyers should take all the fees for technicians travelling abroad.
3. All the parts in the roll forming machine is free to maintain all the life,if in 18 months our company bear the cost for exchanged the broken part like the new parts cost and express cost,if more than 18 month,we also free to maintain the broken parts but for send the new parts,the buyer need bear the express cost.
4. When ship the roll forming machine,We will also send one set CD and specification(Chinese and English) to you with the machine,they can teach you how to operater the machines.
FAQ
1. You are trade company or factory?
We are trade company but we also have own factories. Building trade company is just for exporting various types of cold roll forming machines.
2. Why your price is higher than others?
As we persist on that each factory should put quality at the first place. We spend time and money on developing how to make machines much more automatic, accurate and high quality.
We can make sure that our machine could use more than 20 years without any problem. We can provide 2 years free quality assurance.
3. How long the machine could be made?
Normally speaking, welded pipe making machine could be made without 45 working days.
If you need machines in a hurry, we can make it for you less than a months.