Product introduction:
Tile press equipment may also be referred to roll cold forming, that is, in a row in series forming mill, contact through the metal plate and the metal strip, sequentially to bend, the plates were processed into the desired cross-sectional shape of the plastic processing method.
Components:
The components of this roof panel machine are: manual/automatic decoiler, roll forming machine, plc control system, hydraulic part, cutting part and discharge table.
Characteristic:
Suitable Material | Material | GI, PPGI, PPGL |
Width | 1200 mm | |
Thickness | 0.2-0.7 mm (gauge 24 – gauge 32) | |
Yield strength | 240Mpa – 350Mpa | |
Material of rollers | 45# hard steel (heated and quenched,CNC lathe finish
turning,hard chrome coated 0.05mm) |
|
Rows of rollers | 11 stations | |
Material of shafts | 45# hard steel (heated and quenched,cylindrical
grinding) |
|
Diameter of shafts | 70 mm | |
Material of cutting blade | Cr12Mov | |
Cutting Mode | Hydraulic Guide Column | |
Speed | 15-20 m/min | |
Side plate thickness | 16 mm | |
H steel | 300 mm | |
Chain size | 1 inch | |
Motor | 4kw | |
Voltage | 380V 50HZ 3Phase | |
Appearance size (About) | 6500mm*1600mm*1400mm | |
Weight(About) | 3.5 tons | |
Length measurement | Encoder | |
Control mode | PLC | |
Operating mode | Touch screen | |
Screen Language | Chinese and English or as your require | |
Hydraulic oil | 46# hydraulic oil | |
Color of machine | Blue and red or as your require | |
Color | Blue, green or yellow or as your requirement | |
Service life | 20 years |
Packing Method
Main machine is packaged with plastic film
Transportation
All machines need one 20 feet container to hold
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time
Within 30 days after receiving deposit.
Warranty
Two years, and we will provide technical support for wholelife of the equipment.
If some parts of machine broken within 2 year, we will give customer the spare parts for free. (include chain, bearing, roller,oil pipe, counting wheel) If more than 2 year, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.
Price: 7000-9000$/set
Min Order: 1set
Place of Origin: Hebei, China
Certification: CE
Our company's engineers have learned cold bending knowledge in well-known domestic schools, which gives them great advantages in machine design, R&D and manufacturing. We have also hired many well-known designers in the industry to ensure that we can complete the products you want.
Generally speaking, the machine takes about 40 days to complete, if you need a machine urgently, we can make it urgently, because I have a large number of spare parts.
Because we insist that every factory should put quality first, we make the machines more automated, more reliable and accurate, and have a longer service life. The equipment can be used for nearly 20 years, and we provide lifetime after-sales service.
Product quality is the ultimate, the biggest after-sales service is service, 26 years of production experience, to be a service company that you have the strength to guarantee
Botou Shitong Cold Roll Forming Machinery Manufacturing Co.,Ltd.