Thickness | 0.3mm-0.8mm | Coil Width | 1200mm |
Shaft Diameter | 70mm | Roller Material | High Grade NO. 45 Forged Steel With 0.05mm Hard Chrome Plating |
Shaft Material | High Grade NO. 45 Carbon Wrought Steel | Tile Type | Colored Glaze Steel |
Name | Sheet Metal Roll Forming Machines | Weight | 8T |
Speed | 20m/min | Color | Blue |
High Light | 0.3mm cold roll forming machine, plc cold roll forming machine, plc roll forming roofing machine |
High Quality Three Layer Roof And Wall Pane Roll Forming Roofing Machine
Uncoiling → Feeding material into machine → Roll forming → Auto cutting → Products receiving
Colored Steel Three Layer Roof Tile Roll Forming Making Machine
The three layers roll forming machine will be three models are perfect combination, reasonable structure, beautiful appearance. With the advantages of saving space, simple operation, especially for small site construction and customer use.The machine is mainly composed of feed into the platform, forming host, forming shear device, hydraulic station, computer control system and other parts. Up and down conversion operation is simple, just through the control cabinet on the switch button to control the control of each layer, power can also be controlled by the clutch of each layer. Each layer of the model according to customer requirements.
Processing Flow Diagram of Machine
Suitable For
|
Galvanized Sheet
|
Forming Row
|
Trapezoid tile 15Rows; Corrugated tile 15Rows
|
Feed Width
|
1200mm
|
Sheet Thickness
|
0.3-0.8mm
|
Equipment Shaft Diameter
|
Φ70mm
|
Monitor Rate
|
4KW
|
Rolling Speed
|
2m-8m/min
|
Machine Weight
|
Around 4 tons
|
Pumping Station Motor
|
4KW
|
Equipment Rack
|
300H steel
|
Equipment Transmission
|
0.6 inch chain drive
|
Cut-Off System
|
Automatic computer fixed length
|
Roll Material
|
45 # steel forged parts
|
Shear Blade Heat Treatment
|
HRC58 ° -60 °
|
Cut Off Method
|
Hydraulic shear
|
Shear Blade Material
|
Cr12
|
Control System
|
Xinjie Brand PLC, Touch Screen
|
Tolerance
|
±1mm
|
Product Pictures
Main machine is packaged with plastic film
Transportation
All machines need one 40 feet container to hold
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time
Within 45 days after receiving deposit.
Warranty
Two years, and we will provide technical support for wholelife of the equipment.
If some parts of machine broken within 2 year, we will give customer the spare parts for free. (include chain, bearing, roller,oil pipe, counting wheel) If more than 2 year, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.
Q: How to maintain the machine?
A: Add mechanical lubrication equipment to chain, bearing and cutting slide every month. Add mechanical lubrication to the case every half a year.
Q: Do you sell only standard machines?
A: No, most of our machines are built according to customers specifications, using top brand name components.
Q: How many workers to operate the machine?
A: Only 1-2 workers.
Q: How to visit your company?
A: Fly to Beijing airport: By high speed train From Beijing Nan Station to Cangzhou West Station(1 hour), then we can pick you up.
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou West station(4.5 hours), then we can pick you up.
Q: What can you do if the machine broken?
A: Our machine’s warranty period is 12months,if the broken parts can’t be repaired,we can send the new parts to replace the broken parts for free,but you need pay the express cost yourself.if over warranty period,we can for to solve the problems via negotiation,and we supply the technical support for the whole life of the equipment.
Q: How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference.
2) Please visit company and test machine if convenient.